Shell Building Available

shell#3

Shell #3 is currently available in Lenoir county.  Here is a little information about the facility.

  • Shell building started in 2009
  • Initial cost of $1.5 million
  • C100 contribution was $100,000
  • Shell Building finished in 2010
  • 40,000 square feet with 30′ ceilings
  • Column Space is 40×40
  • Building is precast and metal
  • Building is on 9 acres with a potential to add 8 acres to site
  • Water, sewage, gas, electric, access is already at the site
  • Used as a marketing tool with numerous visiting clients

 